Global Retail Display Partner Program
VIGO DISPLAY makes what goes on and around retail shelving: POP/POS displays, shelf-edge accessories, hooks and pushers, produce stands and checkout fixtures. We do not sell the shelving itself.
Our own 6,000 m² plant in Hangzhou runs metal, plastic, acrylic and wood under one roof. Below is how distributors, fit-out contractors and brand owners work with us, from 100 pcs catalog orders to private label.
One Plant Behind Your Retail Projects
Four material streams share one building: sheet metal, molded plastic, acrylic and wood. Cutting, stamping, welding, powder coating, assembly and export packing all happen on site, so a mixed-material program never gets split across four suppliers.
That shows up on the purchase order. One order can cover price rails, hooks, pushers, a counter display and the baskets by the door, with one packing list, one shipment and one contact.
- Metal, plastic, acrylic and wood processed in-house
- Stamping, welding, powder coating and injection molding on site
- Assembly, inspection and export packing in the same building
- 100 pcs per model, catalog or custom; samples in 7 days, bulk in 25
Three Ways to Partner with VIGO DISPLAY
Each track has its own terms, paperwork and delivery routine. Pick the one that matches how you buy.
Wholesale & Distribution
Importers, wholesalers, regional distributorsOrder from the catalog at the same minimum as customized items. Mix models in one container. Reorder without new tooling or new drawings.
- 100 pcs per model, catalog or custom
- Stock lines for fast replenishment
- Mixed-model containers and carton marking
Store Fit-Out & Installation
Shop fitters, retail contractors, service providersWe don't supply the shelving. We make the displays, hooks and shelf-edge parts that clip onto yours, so slot height, pitch and panel thickness are checked against your shelving profile before we quote. The parts arrive ready to hang.
- Hooks and fittings tooled to your shelving profile: 25 mm Euro slot, slatwall, wire grid and pegboard
- Fit confirmed in writing before the order, not after delivery
- On-site installation support on project orders
- Staging, kitting and carton marking by store
Brand & Private Label
Brand owners, retail chains, agenciesStart from a catalog model and make it your own. Logo, color, packaging and barcode are applied to a dedicated item, not to a stock product with a sticker.
- Logo, silkscreen, color matching and retail-ready packaging
- New tooling quoted separately and broken out per item
- Barcode labeling and store-specific assortments
Which Track Fits You?
Find your role in the first column. The rest of the row is what the arrangement looks like in practice.
| Your role | Track | What you order | Timing |
|---|---|---|---|
| Importer or regional distributor | 01 | Catalog models, mixed containers | Sample 7 days, bulk 25 days |
| Shop fitter or retail contractor | 02 | Store-specific fittings, kitted by site | Quoted per store program |
| Brand owner or retail chain | 03 | Private label, exclusive tooling | Tooling approval, then 25 days |
Six Roles in the Partner Ecosystem
A store opening runs through six kinds of companies, and each one holds a different piece of it: the market, the site, the drawing, the install. We are the plant in the middle that makes the parts they all specify.
Distributors & Importers
They hold stock and cover a territory. Steady volume is what keeps a catalog line running between container shipments.
We supply: stock lines, mixed models per container, carton markingFit-Out Contractors
They run the store program and own the opening date. Whatever we make has to fit the shelving already on site.
We supply: parts matched to your shelving profile, kitted by store, staged by dateBrand Owners & Retail Chains
They own how the display looks in store. A private label item has to look like theirs, not like a stock product with a sticker on it.
We supply: dedicated tooling, logo, color matching, retail-ready packagingDesign Studios & Agencies
They write the fixture specification before anyone quotes it. A drawing that can't be built is an expensive thing to find out late.
We supply: drawing checks, material advice, samples in 7 daysInstallation & Service Partners
They do the last mile: assembly, repairs, replacements. Spare parts and a clear hardware list decide how fast that goes.
We supply: assembly guide and hardware list in every carton, spare parts by modelMaterial & Freight Partners
They supply the steel, resin, board and container space. When their lead time slips, ours slips with it.
We supply: rolling forecasts, consolidated shipments, fixed carton specs- A category test at 100 pcs per model, on catalog lines that need no new tooling
- Parts built to the shelving you already install, with slot height, pitch and panel thickness confirmed in writing before we quote
- Metal, plastic, acrylic and wood from one plant, so one order can cover a whole store
- Reorders on the same tooling: 25 days, same drawings, same packing
- A rolling forecast instead of one-off orders, so material and line time can be planned
- The shelving standards of each market, sent back as drawings and samples we can build to
- Install feedback that goes into the next revision of the part
- A partner who carries the local stock, the install and the after-sales
How the Program Works
Four steps. Each one ends with a document you can check before the next begins.
-
01
Share Requirements
Send a product list, store format or shelving drawing.
Deliverable: specification, minimum quantity and price basis -
02
Design & Sample
Drawings are confirmed, then made into a physical sample.
Deliverable: approved drawing and sample in 7 days -
03
Approve & Produce
Bulk runs once the sample is signed off.
Deliverable: production in 25 days, inspection and packing photos -
04
Repeat & Scale
Reorders use the same tooling and drawings.
Deliverable: reorders plus new SKUs on the same terms
How a Partnership Grows
Most partners start with one store or one container. What changes as volume becomes predictable is the planning horizon and the packing, not the production line.
-
Level 01
Project Supply
One store, one opening date, one fixture list. Scoped and quoted per project.
Typical start: a trial order at 100 pcs per model -
Level 02
Program Supply
The same fixtures repeated across a store program, staged against opening dates.
Changes: kitting and carton marking by store, phased delivery -
Level 03
Distribution
Catalog lines held for replenishment, mixed in one container, reordered without new drawings.
Changes: forecast, stock lines, container planning -
Level 04
Co-Development
Private label or a new fixture designed together, with tooling and drawings held on both sides.
Changes: dedicated tooling, your logo on the item and the carton
What Cooperation Looks Like in Practice
Three patterns our partners repeat most often. Each one starts from something the partner already has: a shelving standard, a test order or a product idea.
A rollout across several stores
- They sendOne shelving standard and a fixture list per store
- We makeFittings tooled to that profile, kitted and marked by store
- They getOne purchase order per phase instead of one per store
Testing a new category
- They sendThree catalog models they want to try in the market
- We makeStock lines at 100 pcs, mixed in one container, with marking, packing list and certificate of origin
- They getA category test without tooling cost
Moving a stock item to private label
- They sendA catalog model plus logo, colour and packaging spec
- We makeA dedicated item: silkscreen, matched colour, retail-ready packaging, barcode
- They getAn own-brand SKU on the same 25-day cycle
What the Numbers Cover
Trustworthy Certification
Product compliance marks and factory audit certificates. Scanned copies are available on request for your tender file or customs clearance.








Shipping, Installation and After-Sales Support
Transit time depends on the route and the port, not on the factory. These are the three options we quote most often.
Delivery Options
- Sea freight: 20 to 40 days door to door, by port
- Air freight: 5 to 10 days
- Express courier: 3 to 7 days for samples and urgent reorders
Installation
- On-site installation support on project orders
- Assembly guide and hardware list in every carton
- Spare parts handled by the contact who quoted the order
Order Visibility
- One contact from quotation to delivery
- Inspection photos before packing
- Packing list, commercial invoice and certificate of origin on request
Partner Program FAQ
These are the questions that come up most often before a first order. Each answer gives the actual term.
What is the minimum order quantity?
100 pcs per model. Catalog and customized items carry the same minimum. New tooling is quoted separately.
How long does a sample take?
7 days. Sample cost and freight are quoted with the request. They are not credited against the bulk order unless we agree in writing.
What is the production lead time?
25 days after sample approval. If new tooling is needed, the 25 days start after tooling approval, not after the inquiry.
Do you also supply the shelving?
No. We make the displays and accessories that go on it, such as shelf-edge rails, label holders, hooks, pushers, dividers and shelf-mounted POP displays, plus free-standing units like produce stands, baskets, carts and checkout fixtures. The shelving, gondolas and racking stay with your fixture supplier, and we build to their standard.
Will your parts fit the shelving we already install?
In most cases, yes. The fittings we quote most are 25 mm Euro slot, slatwall, wire grid and pegboard, but the fit is confirmed from your shelving profile, not from the name of the standard. Send the shelving drawing, or a photo of the shelf edge with a ruler in frame. We confirm slot height, pitch and panel thickness in writing before quoting.
Do you support private label?
Yes. Logo, silkscreen, color matching, barcode labeling and retail-ready packaging are all available. Tooling is quoted separately and broken out per item, so the one-off cost is clear against the unit price.
Which shipping methods do you offer?
Sea freight at 20 to 40 days, air freight at 5 to 10 days, and express courier at 3 to 7 days. Terms are quoted ex-works, FOB or CIF as agreed for each order.
Do you provide on-site installation?
On project orders, yes. Installation is scoped and quoted per project, based on store count, fixture volume and site location.
Apply as a VIGO DISPLAY Partner
Tell us your role, your market and the product list you are working from. We reply with a specification check, the minimum that applies and the lead time.






